Site Glazing Inspection

Site Glazing & Inspection

Site glazing to be completed as required. The contractor must utilize the glazing methods described within this technical manual. The location of glazing packers to be suitable for each application. Glass units must be installed clear of designated ‘wet’ areas in the framing and be packed to prevent opening lights from dropping.

On completion of glazing, and the attachment of any special fittings, the contractor will check the correct functioning of all windows and doors installed making adjustments where necessary.

The contractor will be reponsible for cleaning the framing and glass with approved agents. The protective tape on the framing should then be removed.

The contractor will carefully point an approved low modulus silicone sealant to the joint gap between frame and structure on the outside (Fig 1.). Care should be taken not to seal the drainage path for such as metal lintels.

The ‘Robust Detailing’ methods referred to in Approved Document B of the Building Regulations stipulate that and additional seal line is also placed to the inside gap between frame and structure on new build applications. The use of backing strips for gaps between 6mm - 15mm should be adopted, and the sealant manufacturers guidelines followed (Fig 2.).

Join Our Mailing List & Save Big

Your email address:

Join our famous mailing list and we'll save you hundreds of pounds a year on our range of special offers. If you're in the trade, don't miss out.


Please type the code above.


Contact us
  • Your name:
  • Your email address:
  • Location:
  • Telephone:
  • Enter Your Message Here:
  • verimageurl
  • Enter code:

Deceuninck have tested and hold the following accreditations

© 2011 Glasstec Trade Windows. All rights reserved.